{"id":1030,"date":"2026-09-28T05:55:52","date_gmt":"2026-09-28T05:55:52","guid":{"rendered":"https:\/\/www.windsolarmarket.com\/en\/?post_type=proyectos-renovables&#038;p=1030"},"modified":"2026-09-28T05:55:52","modified_gmt":"2026-09-28T05:55:52","slug":"romania-buzau-country-solar-pv-48-mw","status":"publish","type":"proyectos-renovables","link":"https:\/\/www.windsolarmarket.com\/en\/proyectos-renovables\/romania-buzau-country-solar-pv-48-mw\/","title":{"rendered":"Romania, Buzau Country; Solar PV; 4.8 MW;"},"content":{"rendered":"<p>4.8 MW solar PV project located in Buz\u0103u County, Romania, offered for acquisition through a 100% share sale of the project SPV.<\/p>\n<p>The project is at an advanced stage of development. The grid connection process is developed at the medium-voltage level with DEER (Distribu\u021bie Energie Electric\u0103 Rom\u00e2nia), and the grid solution study has been completed.<\/p>\n<p>The Seller&#8217;s preferred transaction structure is the acquisition of the SPV in its current development stage.<\/p>\n<p>The project also has the potential to integrate a Battery Energy Storage System (BESS). A configuration of approximately 4.8 MW \/ 17.888 MWh may be considered, subject to the technical requirements and approval of the grid operator.<\/p>\n<p>As an alternative to an immediate acquisition, the Seller may consider continuing the development process in order to obtain an updated grid connection approval including BESS, but only under a binding agreement with a committed buyer and provided that the buyer funds the required financial guarantee and all additional development costs associated with the storage integration.<\/p>\n<p>The project land is available and may be acquired separately from the SPV transaction.<\/p>\n<p>The Seller is seeking a qualified investor able to perform due diligence and complete the acquisition within a clearly defined timetable.<\/p>\n<p>Detailed information regarding the grid connection, permitting status, land, technical documentation, project company and BESS integration potential will be made available to qualified investors following execution of a Non-Disclosure Agreement (NDA).<\/p>\n<p>Transaction structure: 100% SPV Share Sale.<\/p>\n<p>Land: available under a separate transaction.<\/p>\n<p>Price: On Request \/ Offers Invited.<\/p>","protected":false},"excerpt":{"rendered":"<p>Development\/Permitting; SPV share sale; Grid connection; MV &#8211; DEER;  Solution Study completed; BESS integration possible; Price: On Request.<\/p>","protected":false},"author":26,"template":"","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"_jf_save_progress":""},"class_list":["post-1030","proyectos-renovables","type-proyectos-renovables","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.windsolarmarket.com\/en\/wp-json\/wp\/v2\/proyectos-renovables\/1030","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.windsolarmarket.com\/en\/wp-json\/wp\/v2\/proyectos-renovables"}],"about":[{"href":"https:\/\/www.windsolarmarket.com\/en\/wp-json\/wp\/v2\/types\/proyectos-renovables"}],"author":[{"embeddable":true,"href":"https:\/\/www.windsolarmarket.com\/en\/wp-json\/wp\/v2\/users\/26"}],"wp:attachment":[{"href":"https:\/\/www.windsolarmarket.com\/en\/wp-json\/wp\/v2\/media?parent=1030"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}